What is a temporary cover actually expected to do?
Keep weather out of the building and nothing else. It does not restore the roof, it does not stop every drop, and it is not a reduced-price repair. It buys the time needed to assess properly, order materials and work in conditions that allow a lasting job.
Thinking of it as a repair causes real harm. A cover left up for months loses its fastenings, chafes the covering it lies on, fills with water where the roof has a low spot and eventually tears at an edge, often in the storm when it was most needed. Meanwhile the deck underneath stays damp and the framing below it dries slowly if at all.
Thinking of it as a holding measure leads to the right decisions. It gets checked after storms, the permanent work gets scheduled rather than postponed indefinitely, and the fastening holes get dealt with as part of that work. See storm damage roof repair for the repair that follows.
Why is a winter cover a different job from a summer one?
Because snow sits where rain runs off. A sheet that sheds a summer downpour can hold a load of wet snow, pond the meltwater under it and then freeze solid, which stresses every fastening and the deck beneath.
In the snowbelt east of Lake Erie a cover may have to live through several days of accumulation before anyone can work on the roof again. That changes how it is fitted: fewer, better anchor points, battens along every edge, the top edge carried high so meltwater cannot track back under it, and no slack where water can pool and turn to ice.
It also changes what happens around the house. Snow and ice will eventually release off a sheeted area, often all at once and more suddenly than off shingles. The ground beneath the eave stays clear of cars, pets and people while a winter cover is up, and the cover is looked at again after every storm.
What should be recorded before the cover goes on?
Photograph the damage before anything is cleaned up or covered, from the ground and from inside, with the date. Once a sheet is over the opening, nobody can see what was underneath it.
Useful shots are wider than people expect: the whole elevation showing where the damage sits on the roof, the opening itself, debris on the ground before it is cleared, the ceiling or wall inside, and anything that came off the roof and landed in the yard. Interior shots of wet insulation and stained framing in the attic are worth as much as the roof pictures.
Write the date and the weather alongside them. If there is a dated storm to connect the damage to, that connection is far easier to make while the evidence is fresh. Whether anything is covered is a matter for your policy and your insurer, not for a roofer, and nobody here will tell you what a claim will do.
What changes the scope of a tarping call?
The size and shape of the opening, where it sits on the roof, the pitch and height, whether the deck around it is sound, how much debris has to be moved first, and the weather at the time. No figure is published here; the price is confirmed on site after inspection and approved before work starts.
A single opening in the middle of a reachable slope with sound deck around it is the simple version. It gets harder with edge and ridge failures, with broken decking that will not hold a fastening, with a limb that has to come off first, with three separate openings on three planes, and with a steep or high roof that needs staging rather than a ladder.
Weather is the variable nobody controls. Wind makes a large sheet unmanageable, ice makes a roof unworkable, and a cover fitted badly in bad conditions is worse than one fitted properly later. No arrival time is promised and no response window is quoted, because a storm that opens one roof here has usually opened several.
Someone is offering to handle everything. What should I watch for?
The New York Attorney General's storm guidance includes a point worth holding on to: do not let work start without the permits it needs. A written contract is required of roofing contractors in this state under General Business Law section 771-b.
After a storm the pressure is to decide fast, and a temporary cover is often the first thing anyone is asked to agree to. It is reasonable to want the building closed up quickly. It is not reasonable to be pushed from that into signing for a full replacement on the same visit, before the roof has been assessed in daylight and dry conditions.
Permits are the specific trap, because the question is local. Ask the village or town code office whether your re-roof needs a permit before work starts; inside the village that is the Village of Gowanda Building Code Enforcement Officer, and the Erie County part falls to Town of Collins code enforcement. Getting that answer first costs a phone call.