The ice is on the eave, so why is the work in the attic?
Because the eave is where the water stops, not where the melting starts. Heat leaving the house melts the underside of the snowpack higher up the slope; the overhang, with no heated room beneath it, is simply where that water meets a cold surface and freezes.
Picture the roof in two zones. Above the outside wall, the deck is being warmed from below by whatever heat escapes the ceiling. Beyond the wall the overhang hangs out in the open air at outdoor temperature. Snow melts in the first zone, runs into the second, and stops. Each cycle thickens the ridge of ice and pushes the pond of water further up the slope behind it.
Once the pond is deep enough it reaches above the laps in the covering, and water sitting still will find a nail hole or a lap it can work backward through. Nothing about the shingles has failed at that point. They were never meant to hold standing water, which is why the only durable answer is to stop the melting rather than to make the eave more waterproof.
Insulation, ventilation or air sealing: which one actually matters?
All three, and that is the finding, not a hedge. Extension guidance from North Dakota State University and the University of Minnesota, and work from the Pacific Northwest National Laboratory at the US Department of Energy, all say insulation by itself does not prevent ice dams and must be paired with ventilation and air sealing.
The reason is that insulation slows heat going through the ceiling but does nothing about air going around it. Warm, moist household air pouring up through a gap beside a chimney or around a recessed light carries far more heat than conduction through the same square foot of ceiling. Add a foot of loose fill over an unsealed attic floor and the air route is still open underneath it.
Ventilation is the third leg because even a well-sealed attic picks up some heat. Cold outside air entering low at the soffit and leaving high at the ridge sweeps that heat away before it can warm the deck. Block the soffits with insulation, as is easy to do in a shallow older attic, and the ventilation stops working on the exact part of the roof where the dam forms.
What is the water doing to the house once it gets in?
It travels. Water that gets behind the eave follows the slope of the deck, the line of a rafter or the top of a wall plate, and it shows up wherever it finds a seam, which can be a room away from the ice.
Inside the wall and ceiling cavity it wets insulation, which then holds it against the framing instead of drying. That is how a short run of ice at the overhang ends up staining a ceiling several feet inboard, swelling a window head on the floor below, or lifting the paint along the top of an upstairs wall in March rather than January.
On the roof itself the damage is quieter and more expensive. Plank decking swells and then delaminates where it is plywood, nails lose their grip in the wet, the fascia softens behind the gutter, and the lowest courses of covering lose their bond. All of that is why the repair opens the eave assembly rather than treating the stain.
What moves the price of ice dam work up or down?
How far the water traveled, how much of the eave has to be opened, the pitch and height of the roof, whether the attic can be reached and worked in, and how many separate eaves ice up. No figure is published for any of it; the price is confirmed on site after inspection and explained and approved before work starts.
A single iced eave with a stain under it and a walk-in attic above is the straightforward case. It gets harder when the attic is a shallow crawl over knee walls, when the damaged run goes around a corner or into a valley, when a dormer sits in the middle of the affected slope, or when the decking turns out to be soft well beyond the wet patch on the ceiling.
Access is the other lever, and in winter it is a real one. A roof that can only be reached over a garage roof or across a steep rear slope, or an eave above a porch roof, changes how the work is staged. None of this is priced from a list: a technician looks, explains what the job involves and gets your agreement before starting.
Can the ice be taken off without wrecking the roof?
Yes, but only by melting and lifting rather than by force. Ice bonds to the granules on an asphalt shingle, so anything driven under it takes the surface of the roof with it.
This is where homeowner damage usually happens. A hammer, a hatchet or a flat bar splits the dam and splits the covering underneath at the same time, and the resulting holes leak as soon as the thaw arrives. Rock salt dumped on a roof is no better: it goes nowhere useful, runs over the metal and the plantings below, and leaves the ice where it was.
Controlled removal accepts that part of the dam is better melted than pried. Gutters and downspouts get cleared so the next meltwater has an exit, and the covering is left intact for the repair that follows. For the broader winter picture see the ice dams and Lake Erie snowbelt roofs guide.